Skip to content
Vereqta

Product

Technical Qualification, Built Around Engineering Reality.

A planned platform that turns project requirements and manufacturer documents into evidence-backed findings an engineer can review.

The workflow

The planned workflow, in six steps. It is under development and not yet available.

  1. 01

    Project Requirements

    The platform reads the project specification and identifies each technical requirement together with the operating conditions it applies to.

  2. 02

    Manufacturer Documentation

    Datasheets, rating tables and option lists are gathered for the equipment being proposed.

  3. 03

    Technical Extraction

    AI-assisted interpretation pulls out ratings, the conditions behind them, and which options are actually confirmed in the proposed configuration.

  4. 04

    Condition-Aware Verification

    Structured checks compare like with like, and flag the cases where conditions differ or cannot be established.

  5. 05

    Evidence-Backed Findings

    Every finding links to the requirement and the manufacturer page it came from, with open questions for the supplier.

  6. 06

    Engineering Review

    Engineers inspect the findings, resolve open items and prepare the qualification review. Final approval stays with them.

What it emphasizes

Condition-aware performance comparisons

A rating is compared with a requirement only when the operating conditions behind both are comparable. Otherwise the software is designed to say so.

Equipment configuration intelligence

A manufacturer offering a feature is not the same as that feature being confirmed in the proposed unit. The platform is designed to keep the two apart.

Traceable technical evidence

Each finding is intended to link to the requirement and the manufacturer page it came from, so a reviewer can verify it quickly.

Human-reviewed engineering decisions

Findings are decision support. Qualified engineers resolve open items and keep responsibility for approval.

These describe intended capabilities, not independently proven performance.

A worked example

The right number means nothing under the wrong conditions.

Matching ATD alone is not enough to establish full engineering comparability. Select a rating, then mark which of the other conditions are established.

Project requirement (fictional)

500 kW minimum

@ 4°C ATD

Cooling capacity, kW

453 kW @ 4°C ATD
Required 500 kW @ 4°C ATD
02505007501,000

Other relevant conditions

Mark each one as established once the datasheet and project requirement are comparable.

  • Secondary supply temperature
  • Coolant type and concentration
  • Secondary flow rate
  • Primary water temperature

Engineering review required

47 kW below the specified minimum at matching ATD. This indicates a potential technical mismatch if all other relevant operating conditions are comparable. 4 of 4 other conditions are not yet established.

Illustrative example using fictional values.

See how a review could look with sample data.

Explore Interactive Demo

Based in

Austin, Texas

Current focus

Engineering Equipment Qualification

Before you write

Read Our Privacy Policy